Ravenswood Gold TSF
Client
Pensar
Location
Ravenswood, Queensland
Services
Project Description
Pensar are delivering a new 160 hectare tailings storage facility as part of a $450 million Ravenswood Gold Mine expansion project. Green Acres Group were awarded a section of the plant hire and have supplied several Articulated Water Trucks and D10 Dozers with operators to assist with the earthworks and site works across the several stages of its construction.
Carmichael Rail Network
Client
Bowen Rail / Martinus
Location
Galilee Basin, Queensland
Services
Project Description
Martinus Rail were awarded a $230 million Carmichael Rail Network North Civil Package. The scope of works includes, construction of 86 kilometres of rail formation works, 10 new multi-span bridges and installation of over 40km of culverts. Martinus was also engaged to complete the narrow gauge rail line for the Carmichael Mine which is approximately 210-kilometres long and connects the mine to the port using existing rail infrastructure. Green Acres Group were selected to complete the revegetation of the rail corridor, temporary laydowns, bridge structures and various site areas. These works included; amelioration, drill seeding and the application of hydromulch. Green Acres Group also supplied several Water Carts, Water Tankers, Drop Deck Trailers to assist with our revegetation works whilst working in with the civil crews performing earthworks and a fleet of AB Triple Side Tippers were allocated to a local quarry who delivering over 600,000t of ballast to the rail line.
CRN Haulage
Client
Lantrak / BMD
Location
Belyando, Queensland
Services
Project Description
Lantrak were awarded the major Road Train Haulage contract to BMD who were completing a sections of the Carmichael Rail Network. The works included delivery of general/structural fills, road base and quarry products to various locations on site using multiple combinations of Road Train Side Tippers. A secondary contract for minor works was awarded to Lantrak to supply capping material for the rail formation. Green Acres Group supplied several combinations which included Double, AB Triple, Triple and Quad Side Tippers. Green Acres Group utilised local employment and suppliers resulting in the local community benefiting from these works.
Blackwater Mine Tailings Dam
Client
Goldings
Location
Blackwater, Queensland
Services
Project Description
Golding Contractors were responsible for the civil works to enable access to new mining area at Blackwater Mine, located between existing operating mine pits. Green Acres Group were engaged to carry out all Landscaping works in accordance with both the Technical and Construction specifications. These works included amelioration to subsoils and topsoil with both liquid and agricultural materials followed by hydromulch application to specified areas. Water Carts were also supplied by Green Acres Group for this project to assist with the continuous water supply to the Hydromulching unit.
Project Description
CPB Contractors worked with Queensland’s Department of Transport and Main Roads to construct Section C: Traveston to Woondum, of the Bruce Highway – Cooroy to Curra upgrade in Queensland. The Section C project delivered 10.5km of new, four-lane divided highway, including seven bridge structures, on a new and improved alignment between Traveston and Woondum, just south of Gympie. Green Acres Group were awarded the Landscape Package for this project which included, supply and installation of turf, supply and installation of jute matting, application of hydromulch, tube stock planting, watering schedule and maintenance program.
Goonyella / South Walker Creek Dragline Move
Client
CPB Contractors
Location
Moranbah, Queensland
Services
Project Description
Dragline 27 was relocated from Goonyella Riverside Mine to South Walker Creek Mine along a route approximately 100 kilometres in length. The Project dragline move route was located near Moranbah, Nebo and Coppabella within the Isaac Regional Council Area of Queensland. The Dragline travelled at a speed of 3km/day, 120m / hr and included four water, four road, three rail and 13 powerline crossings. Green Acres Group assisted with the Plant Hire requirements of this relocation including graders, watercarts, semi tankers and side tippers. The Site rehabilitation contract was also awarded to Green Acres Group which included; amelioration, broadcasting seeding, application of hydromulch.
APLNG Seed Bed Preparation / Pipeline Project
Client
CBP Contractors
Location
Western Downs, Queensland
Services
Project Description
CPB Contractors delivered gas gathering infrastructure for nearly 2,000 wells for APLNG. Works include infrastructure for access tracks and well site lease pad preparation, gas and water pipeline gathering networks, electrical supply networks and rehabilitation of right of ways after installations were complete. Green Acres Group completed all seed bed preparation works including amelioration and drill seeding for these RoW’s on behalf of CPB Contractors. Green Acres Group utilised local employment and suppliers resulting in the local community benefiting from these works.